Internal force calculation and supporting parameters sensitivity analysis of side piles in the subway station excavated by Pile-Beam-Arch method | |
Liu, Xinrong1,2; Liu, Yongquan1,2; Qu, Wanbo3; Tu, Yiliang1,2 | |
2016-06 | |
发表期刊 | TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY
![]() |
ISSN | 0886-7798 |
卷号 | 56页码:186-201 |
摘要 | The Pile-Beam-Arch (PBA) excavation method is widely used in subway station construction for it greatly reduces ground settlement caused by excavation. The stress state of side piles is extremely complex in the supporting system of the subway station excavated by PBA method. This paper deduces the internal force calculation formula for side piles under the most unfavorable loading state with the vertical force considered. Testing apparatus which can model the actual loading state of side piles are designed. Single-factor sensitivity analysis is conducted by means of the reduced-scale model test and numerical simulation to study the three supporting parameters (i.e. pile diameter, pile spacing and buried depth). Results indicate that: the additional bending moment induced by the vertical load at the pile top should be considered in internal force calculation of side piles; values from the deduced theoretical calculation formula agree with the test values; horizontal displacement of the pile body reduces significantly and the bending moment increases greatly with the increase of pile diameter or the decrease of pile spacing; the pile bottom basically meets the constraint condition of the fixed end when the buried depth is two times of the excavation depth. Under the test conditions of this paper, critical sensitivity values of three supporting parameters, i.e. pile diameter, pile spacing and buried depth, are respectively 32 mm, 2d (pile diameter) and 2h (excavation depth). It's more economical and effective to adopt the scheme of increasing pile diameter than the scheme of narrowing pile spacing when there's a high requirement for displacement control of side piles. (C) 2016 Elsevier Ltd. All rights reserved. |
关键词 | PBA excavation method Side pile Internal force calculation Supporting parameters Model test |
DOI | 10.1016/j.tust.2016.03.012 |
收录类别 | SCIE |
语种 | 英语 |
WOS研究方向 | Construction & Building Technology ; Engineering |
WOS类目 | Construction & Building Technology ; Engineering, Civil |
WOS记录号 | WOS:000375815200019 |
出版者 | PERGAMON-ELSEVIER SCIENCE LTD |
原始文献类型 | Article |
出版地 | OXFORD |
引用统计 | |
文献类型 | 期刊论文 |
条目标识符 | https://ir.cqcet.edu.cn/handle/39TD4454/3577 |
专题 | 重庆电子科技职业大学 |
作者单位 | 1.Chongqing Univ, Sch Civil Engn, Chongqing 400045, Peoples R China; 2.Chongqing Univ, Minist Educ, Key Lab New Technol Construct Cities Mt Area, Chongqing 400045, Peoples R China; 3.Chongqing Vocat Inst Engn, Chongqing 400037, Peoples R China |
推荐引用方式 GB/T 7714 | Liu, Xinrong,Liu, Yongquan,Qu, Wanbo,et al. Internal force calculation and supporting parameters sensitivity analysis of side piles in the subway station excavated by Pile-Beam-Arch method[J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY,2016,56:186-201. |
APA | Liu, Xinrong,Liu, Yongquan,Qu, Wanbo,&Tu, Yiliang.(2016).Internal force calculation and supporting parameters sensitivity analysis of side piles in the subway station excavated by Pile-Beam-Arch method.TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY,56,186-201. |
MLA | Liu, Xinrong,et al."Internal force calculation and supporting parameters sensitivity analysis of side piles in the subway station excavated by Pile-Beam-Arch method".TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY 56(2016):186-201. |
条目包含的文件 | 条目无相关文件。 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论