Exploring Key Elements and Performance of BIM and VR Technologies in the Project Management of Assembled Buildings | |
He, Zhi-hong1; Liu, Tao2 | |
2022-05-21 | |
发表期刊 | ADVANCES IN MULTIMEDIA
![]() |
ISSN | 1687-5680 |
EISSN | 1687-5699 |
卷号 | 2022 |
摘要 | The construction industry is the material basis for national economic development. Since the reform and opening up, the construction industry in China has been in a state of continuous expansion to promote economic and social development. However, the traditional mode of building construction in China is rather crude, which not only fails to meet the needs of rapid urban development, but also causes serious environmental pollution and resource shortage. Therefore, it is necessary to conduct relevant technological updates and industrial restructuring to solve these problems, so as to achieve sustainable development. With the advantages of energy saving, low carbon, and short construction cycle, assembled buildings have become a new direction for the transformation of the construction industry. However, China's assembled buildings are still in the promotion stage, and the technical level is relatively backward. Especially in the construction process, there is a lack of management mechanisms adapted to assembled buildings. Hence, some new technologies need to be introduced to promote the development of assembled construction in China. In recent years, with the increasing popularity of assembled construction in China, the technology of assembled construction has also been improving. Also, the interface between assembled construction and modern technology has become more and more obvious. In particular, the application of BIM and VR technologies has been of great help to the development of assembled buildings. To be specific, the combination of these two technologies allows for better control of all aspects of the construction site, thus making the construction project easier to manage. In addition, the application of BIM and VR technologies can not only improve the efficiency of project management, but also improve the quality of construction of assembled buildings, thereby reducing the environmental pollution caused by construction. As a result, the application of BIM and VR technologies has greatly promoted the development of project management of assembled buildings. This paper integrates BIM and VR technologies to study and discuss the key elements and performance of the application of project management for assembled buildings. |
关键词 | Architectural design Construction Economic and social effects Energy conservation Environmental technology Industrial economics Pollution Project management Sustainable development Urban growth BIM technologies Building construction Economic and social development Economic development Environmental pollutions Key elements Material basis Performance Rapid urban development VR technology |
DOI | 10.1155/2022/1168953 |
收录类别 | ESCI ; EI |
语种 | 英语 |
WOS研究方向 | Engineering |
WOS类目 | Engineering, Electrical & Electronic |
WOS记录号 | WOS:000805156800001 |
出版者 | HINDAWI LTD |
EI入藏号 | 20222312199877 |
EI主题词 | Construction industry |
EI分类号 | 402 Buildings and Towers ; 403.1 Urban Planning and Development ; 405 Construction Equipment and Methods ; Surveying ; 408.1 Structural Design, General ; 454 Environmental Engineering ; 525.2 Energy Conservation ; 911.2 Industrial Economics ; 912.2 Management ; 971 Social Sciences |
原始文献类型 | Article |
出版地 | LONDON |
引用统计 | |
文献类型 | 期刊论文 |
条目标识符 | https://ir.cqcet.edu.cn/handle/39TD4454/13849 |
专题 | 重庆电子科技职业大学 |
作者单位 | 1.Chongqing Vocat Coll Culture & Arts, Dept Art & Design, Chongqing 400067, Peoples R China; 2.Chongqing Coll Elect Engn, Coll Artificial Intelligence & Big Data, Chongqing 401331, Peoples R China |
推荐引用方式 GB/T 7714 | He, Zhi-hong,Liu, Tao. Exploring Key Elements and Performance of BIM and VR Technologies in the Project Management of Assembled Buildings[J]. ADVANCES IN MULTIMEDIA,2022,2022. |
APA | He, Zhi-hong,&Liu, Tao.(2022).Exploring Key Elements and Performance of BIM and VR Technologies in the Project Management of Assembled Buildings.ADVANCES IN MULTIMEDIA,2022. |
MLA | He, Zhi-hong,et al."Exploring Key Elements and Performance of BIM and VR Technologies in the Project Management of Assembled Buildings".ADVANCES IN MULTIMEDIA 2022(2022). |
条目包含的文件 | 条目无相关文件。 |
个性服务 |
查看访问统计 |
谷歌学术 |
谷歌学术中相似的文章 |
[He, Zhi-hong]的文章 |
[Liu, Tao]的文章 |
百度学术 |
百度学术中相似的文章 |
[He, Zhi-hong]的文章 |
[Liu, Tao]的文章 |
必应学术 |
必应学术中相似的文章 |
[He, Zhi-hong]的文章 |
[Liu, Tao]的文章 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论